Services

Interior design and drawings

We draw rooms to be lived in for twenty years. We choose and name every surface before a wall moves, and we document it well enough that nobody on site has to guess.

Most interior design ends at a mood board and a furniture list, and then somebody else works out how it gets built. The gap between those two documents is where a renovation goes wrong, because the person who chose the tile is not in the room when the setter asks which way the pattern runs.

NKBA Ontario named Best New Designer in 2025. What leaves our studio is a construction set drawn to be built from, down to the finish schedule. A line reading "white oak floor" is not enough for anyone to order from.

The scope

  1. Layout and space planningHow the rooms get used, which is rarely how the original plan assumed they would be.
  2. 3D you can walk throughYou stand in the room before it exists and catch what a floor plan hides, like a sightline from the door or an island that eats the walkway behind it.
  3. Material selectionEvery surface named. Sample boards in your hand, in your light, because screens lie about colour.
  4. Millwork drawingsShop drawings approved before anything is cut, with the same radius rule carrying from an opening into the niche beside it.
  5. Lighting and electrical layoutsSwitch heights, outlet positions and fixture centres, drawn rather than decided on site by whoever is holding the drill.
  6. Construction documentationA permit-standard set the trades can build from without ringing anyone.
How long

The sequence

Discovery and measure
1 to 2 weeks
Concept and layout
3 to 4 weeks
Design development and 3D
3 to 5 weeks
Selections and sample boards
2 to 4 weeks
Construction and millwork drawings
3 to 5 weeks

Eight to sixteen weeks for a whole house, which is the part of the programme people most often try to compress and most often regret compressing. Weeks saved here tend to come back later as change orders, because construction can only move quickly when the decisions are already made.

What it costs, and what moves it

We scope and price the design before anyone visits, so you know what the drawings cost before you commit to the build. Ask how the design fee relates to the construction contract when we scope it, and get the answer in writing.

Work that changes structure, and any addition, needs whoever takes responsibility for the drawings to be qualified for that particular job. How a firm answers the questions below will tell you more about how it is put together than its portfolio will.

What to ask, whoever you hire

Take this list to us and to everyone else you are considering. The answers are more useful than the portfolios.

  • Whose name and registration number goes on the permit application?
  • Is the design fee separate from the construction contract, and is any of it credited if I proceed?
  • If I stop after the drawings, who owns them and can another builder price from them?
  • How many revisions are included, and what does a change cost after the set is issued?
  • Can I see a full construction set from a completed project, not a portfolio image?
  • Who specifies the structural work, and at what point does an engineer get involved?
Built

Projects

Questions we get on this

What is included in a set of construction drawings?
Layouts, elevations, sections, reflected ceiling plans, electrical and lighting layouts, millwork drawings, and a finish schedule naming every material by species, grade, finish and supplier. The test of a set is whether a trade can build from it without phoning to ask what was meant.
Do I need an interior designer, an architect, or an engineer?
It depends on what you are changing, and the line is drawn more narrowly than most people expect. Ontario decides it by what the work touches and by the size and use of the building, so structure is only part of it. Fire separations, exits and exterior walls can move a job out of a designer's scope on their own. Some work can be taken on by a registered Building Code designer, whose qualification and BCIN go on the permit application. Other work needs a professional engineer, an architect, or both. Ask whoever you hire which of those they are and what their number is, and ask before you sign.
How long does the design stage take?
Eight to sixteen weeks for a whole house, from first measure to a construction set. Compressing it is the most common false economy in a renovation, because every decision deferred past this point costs more once there are trades on site waiting for it.

Further reading

The rest of the work

Begin a project