Adding to a house you already like, rather than buying one you like less. The hardest half of this job happens before anything is built.

An addition is the job where the municipality has the most say and the homeowner has the least warning about it. Everything structural is straightforward by comparison: the risk lives in zoning, in setbacks, in lot coverage, and in whether the thing you want is permitted as of right or needs a minor variance.

If it needs a variance, it goes to the Committee of Adjustment, which is an independent body appointed by council and sits on its own calendar. No builder controls that date. We tell you at feasibility whether your addition is likely to need one, because it is the single largest schedule risk on the job and finding out in month four is how a project loses a construction season.

The scope

  1. Zoning and feasibilityWhat the lot allows as of right, and what would need a variance. Before you commit to a design.
  2. Conservation authority reviewWhere the property sits near a valley, a watercourse or a regulated area, which is common across the northern GTA.
  3. Design and permit drawingsIncluding the structural design, sealed by a professional engineer where the work calls for one.
  4. Committee of AdjustmentPreparing the application and the drawings that go with it, and the notice requirements.
  5. Excavation, footings and structureUnderpinning where the existing foundation needs to go deeper, and the pre-condition survey of neighbouring property that goes with it.
  6. Tie-inRoof, envelope, mechanical and finishes joined to the existing house so the join does not announce itself.
How long

The sequence

Zoning review and feasibility
2 to 4 weeks
Design and structural drawings
8 to 14 weeks
Committee of Adjustment, if required
Set by the municipality
Permit review
Set by the municipality
Excavation and foundation
3 to 6 weeks
Framing, roof and envelope
4 to 10 weeks
Rough-ins, inspections and finishes
12 to 20 weeks

A rear addition that is permitted as of right is a very different programme from one that needs a variance. Treat those as two projects with two timelines, and ask any firm you are considering which one yours is before you get attached to a drawing.

What it costs, and what moves it

Additions carry costs a renovation does not: survey, structural engineering, the variance application if you need one, excavation, and often underpinning where the new foundation has to meet the old one. Those land early and they are spent whether or not the addition proceeds.

Underpinning next to a neighbour carries the most risk on this kind of job. A pre-condition survey of the adjoining property before work starts is cheap, and it is the best evidence there is when an argument starts about a crack that may have been there for a decade.

What to ask, whoever you hire

Take this list to us and to everyone else you are considering. The answers are more useful than the portfolios.

  • Does this addition comply as of right, or does it need a minor variance?
  • Is the property inside a conservation authority regulated area?
  • Who seals the structural drawings, and is the engineer inside your price?
  • Is a pre-condition survey of the neighbouring property included before underpinning?
  • What is the plan if the Committee of Adjustment refuses or defers?
  • Does anything here create a second dwelling unit or change the use, which is what brings development charges into play?
Built

Projects

Questions we get on this

Do I need a minor variance for a home addition?
Only if the addition does not comply with the zoning by-law on setbacks, height, lot coverage or floor space index. If it does not, the application goes to the Committee of Adjustment, whose hearing dates are set by the municipality and not by your builder. Find out at feasibility, because it can add months.
What does a home addition cost in the GTA?
An addition costs more per square foot than renovating existing space, because you are paying for excavation, foundation, structure, envelope and roof before you reach anything you can see. Add survey, structural engineering and the variance application, all of which are spent before construction begins.
What happens if underpinning damages my neighbour’s foundation?
The pre-condition survey described above is what decides it, because it establishes with photographs and dates what was already cracked, settled or out of level before anyone dug. Ask, before the excavator arrives, who carries the liability insurance on the underpinning and what the limit is. Ask also whether the neighbour has been given notice in writing.